It pays to invest in good design balanced in an integrated way. If the buildings are designed using a ‘fabric first’ approach, the form and fabric will seek to provide these performance aspects passively, meaning there is a less intensive demand for mechanical ventilation, electrics and controls.
We take an early approach at the design stage and a common-sense approach to new build and refurbishment works to provide the right solution architects and clients, rather than just doing like for like replacements. Our dedicated technical support and commercial team has a proven track record in providing scheduling, take offs, wind load calculations and a CAD design service.